Facts and figures

Site prep

  • Rhyne piped with 600mm plastic pipe (can drive over)
  • 200tonnes crushed stone/scalpings used
  • 57x 150mm concrete blocks weighing 1.6 tonnes
  • 8 loads spoil removed at >£2000

Foundations

  • Segmented precast concrete piles in 25 positions
  • Each position consists of 6 pile segments
  • Each pile segment is 2.5mx0.25mx0.25m and weighs 250Kg
  • Each pile hammered into the ground to a depth of 15m
  • 20tonne piling rig used to wield 4.5tonne hammer
  • Total piles used - 150 weighing 37.5tonnes with a total length of 375m

Footings

  • Poured concrete reinforced ring beam 450mmx450mm
  • 2.5tonnes of reinforced steel rebar
  • 450mx25mm diameter main steel bars
  • 700 x 10mm steel rebar rings every 105mm
  • Rings and rebar hand tied together with 3000 metal ties
  • 40cubic metres of C25 ready mixed concrete delivered in 5 lorries
  • Pumped into place with a 37m concrete pump

Ground floor

  • 54 concrete beams up to 6.2m long weighing up to 300Kg each
  • infilled with 1065 100mm concrete blocks weighing 22 tonnes

Roof

  • 2.7Km tile batten fixed with 7500 nails
  • 12,000 Clay plain tiles weighing 16tonnes
  • 10,000 aluminium nails used to fix tiles

Cladding

  • 14,000 facing bricks weighing 34 tonnes
  • 16tonnes red sand
  • 75 bags cement

Under Floor heating

  • 1.5Km pipework

Heat recover ventilation

Wiring

Large Machinery/Plant used

  • Our own Purple dumper!
  • 20T piling rig
  • Rough terrain forklift truck
  • 0.9tonne digger
  • 3tonne digger
  • 4.5tonne digger
  • 12m telehandler
  • 7m telehandler
  • JCB and driver